Case Study 36: RTO Upgrade at Municipal WWTP Boosts Capacity, Cuts Operating Costs

        • $1.1 million annual revenue from added throughput
        • $40,000 annual power savings, with capacity to spare after installing
          Multi-Layer Media (MLM) for heat recovery

[Click here to view the full PDF case study]

Summary
A regenerative thermal oxidizer using ceramic saddles for heat recovery had become a bottleneck in an otherwise efficient sludge incineration process at the Fitchburg, Massachusetts wastewater treatment plant. Deteriorated old heat-exchange media was limiting the plant's throughput, wasting electric power, and requiring frequent shutdowns to wash out. Operation and maintenance costs were simply too high.

In June 2002 the oxidizer was upgraded by installing state-of-the-art MLM ceramic media having lower pressure drop, higher heat capacity, and better resistance to fouling than the old saddles.

The media upgrade eliminated the bottleneck, allowing Fitchburg to reduce landfill disposal costs by incinerating more sludge. The plant increased its revenue by processing biosolids from adjacent communities, while reducing electric power consumption. The revamped oxidizer has extra capacity for future expansion of the incinerator. Shutdowns for maintenance are now less frequent, and the new heat-exchange media has proven easier to clean.

The oxidizer upgrade paid for itself in a few months.

[View full case study]

 

Results of Retrofit with MLM-160-6
  Before After
RTO Media ½" saddles MLM-160-6
Sludge Processed
1.5 ton/hr 1.9 ton/hr
Media DP 25~30" WC 3~8.5" WC
Fan Power Cost $53,000/yr $9,800/yr
Shutdowns for
Media Cleaning
6~12/yr 2/yr
Added Revenue
N/A $1,140,000/yr
RTO Capacity 14,000 scfm 24,000 scfm

MLM160-6®

[View full case study]

 